News Date:
November 8, 2021
News Content:
- Cost-Share limit per landowner per year - $30,000 for terraces, waterways, diversions, basins for fall projects and for summer projects $35,000.
- Earthwork Rates have changed:$3.50 a FT for Broadbase Terraces, $3.04 a FT for Narrowbase Terraces, $3.20 for CYs, $1.58 a FT for Trench/Backfill<12, $1.87 a FT for Trench/Backfill >12, $3493.00 per acre for Waterways.
- Cost-Share will be allowed for structures to be constructed in idle or crop fields.
- Cover Crops can be cost shared up to 200 Acres.
- Cost-Share for Cover Crops does not count toward the $30,000 Cost-Share limit for other practices.
News County: